TY - JOUR
T1 - On employing pythagorean fuzzy processing time to minimize machine rental cost
AU - El-Morsy, Salwa
AU - Ahmad, Junaid
AU - George, Reny
N1 - Publisher Copyright:
© 2023 the Author(s), licensee AIMS Press.
PY - 2023
Y1 - 2023
N2 - The aim of this paper is to obtain the minimal rental cost of the three-phases flow shop scheduling problems. A novel strategy to tackle this issue using Pythagorean fuzzy processing time is introduced. It depends on converting the three stages machine into two stages when the minimum value of processing time of the first machine is greater than the maximum value of processing time of the second machine. The vague processing time does not convert to its crisp form. The jobs sequencing in machines is obtained using Johnson procedure. The zero element of the Pythagorean set is defined as, Õp = (0,1) i.e., it has zero membership and one nonmembership values. A numerical example include Pythagorean rental cost is delivered to demonstrate the reliability of the suggested strategy. The idle time, utilization time, and the overall cost are calculated. The idle time of all machines is zero, which minimize the required time and hence, minimize the total rental cost.
AB - The aim of this paper is to obtain the minimal rental cost of the three-phases flow shop scheduling problems. A novel strategy to tackle this issue using Pythagorean fuzzy processing time is introduced. It depends on converting the three stages machine into two stages when the minimum value of processing time of the first machine is greater than the maximum value of processing time of the second machine. The vague processing time does not convert to its crisp form. The jobs sequencing in machines is obtained using Johnson procedure. The zero element of the Pythagorean set is defined as, Õp = (0,1) i.e., it has zero membership and one nonmembership values. A numerical example include Pythagorean rental cost is delivered to demonstrate the reliability of the suggested strategy. The idle time, utilization time, and the overall cost are calculated. The idle time of all machines is zero, which minimize the required time and hence, minimize the total rental cost.
KW - decision making
KW - flow shop scheduling
KW - fuzzy processing time
KW - optimization problems
KW - pythagorean fuzzy numbers
UR - http://www.scopus.com/inward/record.url?scp=85162803522&partnerID=8YFLogxK
U2 - 10.3934/math.2023882
DO - 10.3934/math.2023882
M3 - Article
AN - SCOPUS:85162803522
SN - 2473-6988
VL - 8
SP - 17259
EP - 17271
JO - AIMS Mathematics
JF - AIMS Mathematics
IS - 7
ER -